Condo Community Room & Entrance Remodel – Redington Beach, FL
This condo community renovation in Redington Beach, Florida began after hurricane-related flooding caused significant interior damage. Damaged drywall was flood-cut approximately four feet above the floor, and the affected areas were prepared for complete restoration and reconstruction.
Sand Palms Construction coordinated the renovation from damaged conditions through the finished interior. The project included a new kitchen, new bathroom, office area, entertainment area, interior doors, baseboards, trim, drywall, painting and other interior finish work.
The completed project transformed the storm-damaged common areas into a clean, updated and functional space for residents and guests.

Project Scope
-
Hurricane and flood damage restoration
-
Office area renovation
-
Entertainment/common area renovation
-
Final interior finishes
Demolition & Site Preparation
The project began with selective demolition throughout the affected areas. Work included removal of damaged flooring, ceiling drywall, bathroom finishes and the existing kitchen area.
The damaged drywall ceiling was removed in preparation for installation of a new drop-ceiling system. Temporary ZipWall-style containment and plastic barriers were also installed to help control dust and separate active construction areas from the rest of the property.
This preparation created a clean starting point for the restoration and reconstruction of the Redington Beach condo community space.
Flooring Removal, Leveling & Tile Installation
The existing tile flooring was removed throughout the affected areas to expose the underlying floor surface. After demolition, the floor was evaluated and prepared for the new installation. A cement-based floor leveling material was applied where needed to correct low spots and create a smoother, more uniform surface.
Once the floor preparation was complete and properly cured, new tile was installed to provide a clean, durable finished surface. Proper leveling and preparation helped ensure consistent tile placement, improved transitions and a more professional final appearance throughout the remodeled space.
Kitchen Remodel & Entertainment Area
The renovation included a complete rebuild of the kitchen, office and entertainment areas with a clean, coordinated shaker-style design. New shaker cabinetry was installed throughout the kitchen, along with pantry cabinets and a central island to provide additional storage, workspace and functionality.
The adjacent office and entertainment areas were also upgraded with custom-style cabinetry, built-in shelving and bookcases to create organized, functional spaces that tie into the overall design of the remodeled community room. The result is a more modern, cohesive interior with improved storage, usability and appearance.
Interior Doors, Baseboard, Trim, & Suspended Ceiling
The interior finish work included installation of new six-panel interior doors, colonial-style baseboards and trim throughout the remodeled areas. All new trim was prepared and painted to provide a clean, consistent finish that ties the renovated spaces together.
A new suspended drop-ceiling system was also installed to replace the previous drywall ceiling. This provides easier access to first-floor plumbing and electrical components while maintaining a clean, finished appearance throughout the community room.
Bathroom Remodel & Accessibility Upgrades
The bathroom was completely renovated to improve both appearance and accessibility. The new layout included a walk-in shower with a low-threshold entry, strategically placed grab bars and improved clearance to make the space easier to navigate for residents with mobility needs.
New tile, plumbing fixtures, vanity components and interior finishes were installed as part of the remodel. The finished bathroom provides a cleaner, more functional space while incorporating accessibility features designed to improve safety and ease of use.