This condo community renovation in Redington Beach, Florida began after hurricane-related flooding caused significant interior damage. Damaged drywall was flood-cut approximately four feet above the floor, and the affected areas were prepared for complete restoration and reconstruction.

​

Sand Palms Construction coordinated the renovation from damaged conditions through the finished interior. The project included a new kitchen, new bathroom, office area, entertainment area, interior doors, baseboards, trim, drywall, painting and other interior finish work.

​

The completed project transformed the storm-damaged common areas into a clean, updated and functional space for residents and guests.

20260808_165723.jpg

Project Scope

Demolition & Site Preparation

The project began with selective demolition throughout the affected areas. Work included removal of damaged flooring, ceiling drywall, bathroom finishes and the existing kitchen area.

​

The damaged drywall ceiling was removed in preparation for installation of a new drop-ceiling system. Temporary ZipWall-style containment and plastic barriers were also installed to help control dust and separate active construction areas from the rest of the property.

​

This preparation created a clean starting point for the restoration and reconstruction of the Redington Beach condo community space.

Flooring Removal, Leveling & Tile Installation

The existing tile flooring was removed throughout the affected areas to expose the underlying floor surface. After demolition, the floor was evaluated and prepared for the new installation. A cement-based floor leveling material was applied where needed to correct low spots and create a smoother, more uniform surface.

​

Once the floor preparation was complete and properly cured, new tile was installed to provide a clean, durable finished surface. Proper leveling and preparation helped ensure consistent tile placement, improved transitions and a more professional final appearance throughout the remodeled space.

Kitchen Remodel & Entertainment Area

The renovation included a complete rebuild of the kitchen, office and entertainment areas with a clean, coordinated shaker-style design. New shaker cabinetry was installed throughout the kitchen, along with pantry cabinets and a central island to provide additional storage, workspace and functionality.

​

The adjacent office and entertainment areas were also upgraded with custom-style cabinetry, built-in shelving and bookcases to create organized, functional spaces that tie into the overall design of the remodeled community room. The result is a more modern, cohesive interior with improved storage, usability and appearance.

Interior Doors, Baseboard, Trim, & Suspended Ceiling

The interior finish work included installation of new six-panel interior doors, colonial-style baseboards and trim throughout the remodeled areas. All new trim was prepared and painted to provide a clean, consistent finish that ties the renovated spaces together.

​

A new suspended drop-ceiling system was also installed to replace the previous drywall ceiling. This provides easier access to first-floor plumbing and electrical components while maintaining a clean, finished appearance throughout the community room.

Bathroom Remodel & Accessibility Upgrades

The bathroom was completely renovated to improve both appearance and accessibility. The new layout included a walk-in shower with a low-threshold entry, strategically placed grab bars and improved clearance to make the space easier to navigate for residents with mobility needs.

​

New tile, plumbing fixtures, vanity components and interior finishes were installed as part of the remodel. The finished bathroom provides a cleaner, more functional space while incorporating accessibility features designed to improve safety and ease of use.